Limited work completed on-site
·
Asphalt driveway restorations completed
·
Began
installation and final grading of topsoil
·
General
site clean-up
Work Anticipated to be completed Next week, July 4th
to July 8th
·
No work over the July 4th Holiday
·
Complete installation and final grading of
topsoil
·
Sod Installation
Once the topsoil installation
is completed, we request those residents with irrigation systems damaged during
construction to please have them replaced and / or repaired by your irrigation
contractor. It is typically easier for your irrigation contractor to repair the
irrigation system after topsoil installation, but prior to sod installation.
Currently, the contractor is
anticipating to perform the asphalt surface paving the week of July 11th.
Thanks again for your
patience as the landscape restoration was delayed.
The contractor will not be
on-site over the July 4th Holiday. Have a safe and enjoyable Holiday
Weekend!!!